top of page

2011-2013

 

 

Alba (CN)

 

 

Public parking lot

 

 

 

Client

Ferrero S.p.a.

 

Area

7.800 mq

 

 

 

 

 

 

 

Parking lot

Ferrero

To meet the need of parking space, a garage was made on two levels. The structure with a steel skeleton and cement labs allows to keep the area for manoeuvres free. To mitigate the visual impact of the elevated external structure there is a metal grid in different shades of green. The surrounding green area creates a filter between the garage and the area of competence of the Fondazione Ferrero’s kindergarten.

bottom of page